Home arrow Neighborhood News arrow Pool II Facility Renovations - 2013
Pool II Facility Renovations - 2013 Print
The Pool II facility will open the 2013 swim season in May, with a fresh look following necessary renovations. Each activity addresses specific issues, and the overall strategy is to provide residents with low maintenance, long term solutions. These include:

• Pool II’s new plaster and tiles. This renovation is less intensive than last year at Pool I, but as necessary to address sanitation and maintenance issues and improve resident’s overall satisfaction of the facility.

• Replacing the aged wood deck with one made of composite materials. These materials eliminate annual maintenance, are not susceptible to insect damage and are friendly to swimmer’s bare feet. This replacement also provides the opportunity to optimize the deck layout, and increase seating for event viewing and general recreation.

Additionally, both the Pool I and Pool II facilities will feature liquid chlorination systems. These provide faster and more measured responses to sanitation demands caused by fluctuations in swimmer load and environmental issues.

Residents are invited to review their improved Pool II facility during the May 19 ‘Open House’!
 
< Prev   Next >